Ertan Dam

You can help expand this article with text translated from the corresponding article in Chinese. (November 2014) Click [show] for important translation instructions.
  • View a machine-translated version of the Chinese article.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Chinese Wikipedia article at [[:zh:二滩水电站]]; see its history for attribution.
  • You may also add the template {{Translated|zh|二滩水电站}} to the talk page.
  • For more guidance, see Wikipedia:Translation.
Flood discharge of Ertan
Dam in Sichuan, China
26°49′15″N 101°46′52″E / 26.82083°N 101.78111°E / 26.82083; 101.78111StatusOperationalConstruction beganSeptember 1991Opening date26 December 1999Owner(s)Yalong River Hydropower Development Company, Ltd.Dam and spillwaysType of damArchImpoundsYalong RiverHeight240 m (787 ft)Length774.7 m (2,542 ft)Dam volume5,857,000 m3 (206,838,003 cu ft)Spillway type7 x crest outlets, 2 x flood tunnelsSpillway capacity6,260 m3/s (221,070 cu ft/s)
Tunnels:7,400 m3/s (261,329 cu ft/s)ReservoirCreatesErtan ReservoirTotal capacity5,800,000,000 m3 (4,702,137 acre⋅ft)Catchment area116,400 km2 (44,942 sq mi)Surface area101 km2 (39 sq mi)Power StationHydraulic head189 m (620 ft) (max gross)Turbines6 × 550 MW Francis turbinesInstalled capacity3,300 MWAnnual generation17 TWh

The Ertan Dam (simplified Chinese: 二滩大坝; traditional Chinese: 二灘大壩; pinyin: Èrtān Dàbà) is an arch dam on the Yalong River, a tributary of the Yangtze River in Sichuan Province, in southwest China.

The dam has six hydroelectric generators, each with a generating capacity of 550 MW. The total generating capacity of the facility is 3,300 MW, one of the largest hydroelectric stations in China. The annual production is 17 TWh, and until December 5, 2006, it has produced over 100 TWh of electricity. Construction of the dam started on September 1991 and was completed on December 26, 1999.[1][2] A total of 12,638,000 m3 (446,306,758 cu ft) of material was excavated during construction.

The Ertan Dam was designed by the China Hydropower Engineering Consulting Group Survey and Design Institute in Chengdu, and was constructed and is currently operated by Ertan Hydropower Development Company Limited, the owners of the dam. The company is invested by State Development and Investment Company (52% share) and Sichuan Chuantou Energy Limited (48% share).

General layout of Ertan hydroelectric scheme[3]

Design

The Ertan Dam is a 240 m (787 ft) high and 774.7 m (2,542 ft) long double-curvature arch dam. The dam withholds a normal reservoir of 5,800,000,000 m3 (4,702,137 acre⋅ft) with a drainage area of 116,400 km2 (44,942 sq mi) and normal surface area of 101 km2 (39 sq mi). The dam has four different ways to discharge water downstream. First, the dam's spillways which contain 7 x floodgates at the crest and two flood tunnels can discharge 6,260 m3/s (221,070 cu ft/s) and 7,400 m3/s (261,329 cu ft/s) respectively. The dam also contains 6 x middle outlets and 4 x bottom outlets that can discharge 6,930 m3/s (244,731 cu ft/s) and 2,084 m3/s (73,596 cu ft/s) respectively. The dam's power station is located underground along with its transformer room which is in a separate cavern. Additionally, the power station is supported by an underground surge chamber as well.[3]

Main Features

Source:[3]

Project Location On the Yalong River, Sichuan province,

P. R. China

Project Purpose Hydroelectric Power Generation
Years of Construction 1987-1999
Construction of Main Dam
Type Double-curvature Arch Dam
Height 240 m
Crest Length 774.69 m
Construction of Power plant
Maximum gross head 189 m
Installed Capacity 6×550 MW (Francis)
Power Conduits 6 steel embedded in concrete

I.D.=9.0 m

Catchment and Reservoir
Catchment Area 116,400 km2
Mean Annual Runoff 1,670 m3/s
Reservoir Area at FSL 101 km2
Storage at FSL 5,800 million m3
Active Storage 3,370 million m3
Discharge Capacity
Crest Outlet 7 / 6,260 m3/s
Mid Level Outlet 6 / 6,930 m3/s
Bottom Outlet 4 / 2,084 m3/s
Flood Discharging 2 / 7,400 m3/s
Project Developers
Owner Ertan Hydropower Development

Company, Ltd.

Designer CHIDI,

now POWERCHINA Chengdu

Contractor EJV, SGEJV, GYBD
Main Equipment Suppliers
Turbines GE Canada, Dongfang Electrical

Machinery Co, Ltd., Harbin Electric

Machinery Co, Ltd.

Generators & HV

Electrical

GE Canada, Dongfang Electrical

Machinery Co, Ltd., Harbin Electric

Machinery Co, Ltd.

Gates &

Hydromechanical

Jiajiang Hydraulic Machinery Works,

China Gezhouba (Group) Corporation,

Sinohydro Bureau No.8,

See also

  • flagChina portal
  • iconWater portal
  • iconRenewable energy portal

References

  1. ^ Ertan Hydroelectric Dam
  2. ^ "我国西部的最大水电站二滩水电站全面建成投产". Archived from the original on 2011-05-07. Retrieved 2008-02-09.
  3. ^ a b c "Ertan Hydropower Project" (PDF). Chinese National Committee on Large Dams. Retrieved 8 January 2011.
  • v
  • t
  • e
Authority control databases: Geographic Edit this at Wikidata
  • Structurae